Shao-mo Memorial Natatorium Complex history

 

Construction started on May 10, 1990. The construction period is one year. The total construction price is more than 300 million(TWD). The building is six stories high and the area is 22,42 square meters. The swimming pool is located on the fourth floor, with a glass curtain on the front and a far-sighted view of the morning sun. The evening photos are beautiful. The pool is 50 meters long and 18 meters wide. The waterway is modern and has a handicapped slope design. As far as the teaching environment is concerned, it is rare in domestic universities.